NH125 over ISINGLASS RIVER
.1 MI BARRINGTON T.L. · County 017, New Hampshire · Built 1951 · 2 Lanes · 14,407 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
43.248975, -70.98145
This bridge is in worse condition than 90.4% of bridges in County 017. The average bridge in New Hampshire is 0 years old; this one is 75 years old.
Nearby Bridges
STILLWATER CIRCLE over BROOK
Built 1988
GREENHILL ROAD over ISINGLASS RIVER
Built 1955
ROCHESTER NECK RD over ISINGLASS RIVER
Built 1979
MAIN STREET over COCHECO RIVER
Built 1986
TEBBETTS ROAD over NH 16 SP TPK
Built 1957
NH 16 SP TPK over BLACKWATER ROAD
Built 1957
SP TPK SB ON RAMP over COCHECO RIVER
Built 2009
NH 16 SP TPK over COCHECO RIVER
Built 2010
SP TPK NB OFF RAMP over COCHECO RIVER
Built 2010
NH 16 SP TPK RAMP over NH125
Built 2009
Bridge Details
- Structure #
- 022202060011000
- Year Built
- 1951
- Reconstructed
- 1979
- Length
- 36.3 m (119.1 ft)
- Max Span
- 17.4 m
- Width
- 13.7 m (44.9 ft)
- Lanes
- 2
- Daily Traffic
- 14,407
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $272,000
- Total Project Cost
- $314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.