TEBBETTS ROAD over NH 16 SP TPK

1.7 MI FROM DOVER TL · County 017, New Hampshire · Built 1957 · 2 Lanes · 4,661 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
022201760013300
Year Built
1957
Reconstructed
1992
Length
51.2 m (168 ft)
Max Span
14.3 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
4,661
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.