NH 16 SP TPK over COCHECO RIVER
1.0 MI FROM RT 16 · County 017, New Hampshire · Built 2010 · 4 Lanes · 39,653 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
43.281683, -70.977369
This bridge is in worse condition than 9.6% of bridges in County 017. The average bridge in New Hampshire is 0 years old; this one is 16 years old.
Nearby Bridges
SP TPK NB OFF RAMP over COCHECO RIVER
Built 2010
SP TPK SB ON RAMP over COCHECO RIVER
Built 2009
NH 16 SP TPK RAMP over NH125
Built 2009
NH125 over AXE HANDLE BROOK
Built 1983
NH125 over COCHECO RIVER
Built 1931
MAIN STREET over COCHECO RIVER
Built 1986
NH 16 SP TPK over AXEHANDLE BROOK
Built 1957
NH 16 SP TPK over US202
Built 2011
CHESLEY HILL ROAD over AXE HANDLE BROOK
Built 2008
TEBBETTS ROAD over NH 16 SP TPK
Built 1957
Bridge Details
- Structure #
- 022201580011300
- Year Built
- 2010
- Length
- 50.6 m (166 ft)
- Max Span
- 48.8 m
- Width
- 30.8 m (101 ft)
- Lanes
- 4
- Daily Traffic
- 39,653
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- $272,000
- Total Project Cost
- $314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.