NH 16 SP TPK over AXEHANDLE BROOK

1.2 MI FROM JCT. RT 202A · County 017, New Hampshire · Built 1957 · 4 Lanes · 39,505 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
022201470009900
Year Built
1957
Reconstructed
2011
Length
9.8 m (32.2 ft)
Max Span
4 m
Lanes
4
Daily Traffic
39,505
Material
Concrete Continuous
Design
Culvert
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.