US202 NH 16 SP TPK over NH202A (WALNUT STREET)
1.0 MI FROM JCT RT 11 · County 017, New Hampshire · Built 1957 · 6 Lanes · 41,600 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
43.304939, -70.995036
This bridge is in worse condition than 9.6% of bridges in County 017. The average bridge in New Hampshire is 0 years old; this one is 69 years old.
Nearby Bridges
US202 NH 16 SP TPK over TEN ROD ROAD
Built 2012
NH 16 SP TPK over US202
Built 2011
NH202A over COCHECO RIVER
Built 1883
BRIDGE STREET over COCHECO RIVER
Built 1920
NH 11 over US202 NH 16 SP TPK
Built 2011
NH 16 SP TPK over AXEHANDLE BROOK
Built 1957
NH 16 SP TPK RAMP over COCHECO R. BACKWATER
Built 2012
NH 16 SP TPK NB over COCHECO RIVER
Built 2012
NH 16 SP TPK SB over COCHECO RIVER
Built 2012
NH 16 SP TPK RAMP over COCHECO RIVER
Built 2012
Bridge Details
- Structure #
- 022201280008900
- Year Built
- 1957
- Reconstructed
- 2011
- Length
- 17.8 m (58.4 ft)
- Max Span
- 15.3 m
- Width
- 38.6 m (126.6 ft)
- Lanes
- 6
- Daily Traffic
- 41,600
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- State Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- $272,000
- Total Project Cost
- $314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.