NH 16 SP TPK SB over COCHECO RIVER
0.2 MI N JCT RT 11 · County 017, New Hampshire · Built 2012 · 2 Lanes · 18,254 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
43.321392, -70.9929
This bridge is in worse condition than 9.6% of bridges in County 017. The average bridge in New Hampshire is 0 years old; this one is 14 years old.
Nearby Bridges
NH 16 SP TPK RAMP over COCHECO RIVER
Built 2012
NH 16 SP TPK NB over COCHECO RIVER
Built 2012
NH 16 SP TPK RAMP over COCHECO R. BACKWATER
Built 2012
US202 NH 11 SP TPK over RECREATION TRAIL
Built 1978
NH 11 over US202 NH 16 SP TPK
Built 2011
US202 NH 11 SP TPK over CHESTNUT HILL ROAD
Built 1978
NH 16 SP TPK over NH 16 CONNECTOR
Built 1978
US202 NH 16 SP TPK over TEN ROD ROAD
Built 2012
US202 NH 11 over NHNCRR
Built 1957
US202 NH 11 over NH125
Built 1957
Bridge Details
- Structure #
- 022201050009100
- Year Built
- 2012
- Length
- 44.3 m (145.3 ft)
- Max Span
- 42.8 m
- Width
- 15.4 m (50.5 ft)
- Lanes
- 2
- Daily Traffic
- 18,254
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- $272,000
- Total Project Cost
- $314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.