US202 NH 11 SP TPK over CHESTNUT HILL ROAD

2.9 MI S OF MILTON TL · County 017, New Hampshire · Built 1978 · 5 Lanes · 15,397 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
022201020009600
Year Built
1978
Reconstructed
2012
Length
21.9 m (71.9 ft)
Max Span
20.4 m
Width
34.4 m (112.9 ft)
Lanes
5
Daily Traffic
15,397
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000