US202 NH 11 over NHNCRR
.5 MI E OF SPAULDING TPK · County 017, New Hampshire · Built 1957 · 2 Lanes · 16,502 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
43.328789, -70.978242
This bridge is in worse condition than 79.4% of bridges in County 017. The average bridge in New Hampshire is 0 years old; this one is 69 years old.
Nearby Bridges
US202 NH 11 over NH125
Built 1957
NH125(RAMP D) over US202 NH 11 WB(RAMP A)
Built 1966
NH 16 SP TPK over NH 16 CONNECTOR
Built 1978
US202 NH 11 SP TPK over CHESTNUT HILL ROAD
Built 1978
US202 NH 11 SP TPK over RECREATION TRAIL
Built 1978
NH 16 SP TPK NB over COCHECO RIVER
Built 2012
NH 16 SP TPK SB over COCHECO RIVER
Built 2012
NH 16 SP TPK RAMP over COCHECO RIVER
Built 2012
NH 16 SP TPK RAMP over COCHECO R. BACKWATER
Built 2012
NH 11 over US202 NH 16 SP TPK
Built 2011
Bridge Details
- Structure #
- 022200950010600
- Year Built
- 1957
- Reconstructed
- 1986
- Length
- 43 m (141.1 ft)
- Max Span
- 15.8 m
- Width
- 11.3 m (37.1 ft)
- Lanes
- 2
- Daily Traffic
- 16,502
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- $272,000
- Total Project Cost
- $314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.