NH125(RAMP D) over US202 NH 11 WB(RAMP A)

.7 MI FROM JCT NH 16 · County 017, New Hampshire · Built 1966 · 2 Lanes · 8,957 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
022200890011200
Year Built
1966
Reconstructed
1993
Length
37.8 m (124 ft)
Max Span
15.5 m
Width
14.6 m (47.9 ft)
Lanes
2
Daily Traffic
8,957
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000