NH 16 SP TPK RAMP over NH125

3.25 MI N DOVER T/L · County 017, New Hampshire · Built 2009 · 5 Lanes · 44,530 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
022201580011000
Year Built
2009
Length
45.1 m (148 ft)
Max Span
43.9 m
Width
44.2 m (145 ft)
Lanes
5
Daily Traffic
44,530
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000