NH 16 over SACO RIVER

1.6MI ALBANY TL · County 003, New Hampshire · Built 1945 · 2 Lanes · 12,188 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
005401700007100
Year Built
1945
Reconstructed
1978
Length
124.4 m (408.1 ft)
Max Span
48.2 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
12,188
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.