TASKER HILL ROAD over PEQUAWKET POND

IN CONWAY VILLAGE · County 003, New Hampshire · Built 2010 · 2 Lanes · 510 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
005401820006600
Year Built
2010
Length
10.4 m (34.1 ft)
Max Span
9.8 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
510
Material
Prestressed Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.