US302 over SACO RIVER

2.4 MI E JCT 16 · County 003, New Hampshire · Built 1972 · 2 Lanes · 13,313 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
005401520009800
Year Built
1972
Length
127.7 m (419 ft)
Max Span
49.4 m
Width
14.2 m (46.6 ft)
Lanes
2
Daily Traffic
13,313
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.