NH 16 NH113 over PEQUAWKET POND
1.2 MI FROM ALBANY TL · County 003, New Hampshire · Built 1940 · 2 Lanes · 19,487 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 6 | Satisfactory |
Location
43.978544, -71.121267
This bridge is in worse condition than 54.9% of bridges in County 003. The average bridge in New Hampshire is 0 years old; this one is 86 years old.
Nearby Bridges
NH 16 over SACO RIVER
Built 1945
EAST SIDE ROAD over SACO RIVER
Built 1890
WASHINGTON STREET over SWIFT RIVER
Built 1975
TASKER HILL ROAD over PEQUAWKET POND
Built 2010
US302 over SACO RIVER
Built 1972
MILL STREET over CONWAY LAKE OUTLET
Built 1940
US302 NH113 over CONWAY LAKE OUTLET
Built 2021
POTTER ROAD over SNOW BROOK
Built 2022
POTTER ROAD over CONWAY LAKE INLET
Built 2009
DRAKE HILL ROAD over MEADOW BROOK
Built 1930
Bridge Details
- Structure #
- 005401730006200
- Year Built
- 1940
- Reconstructed
- 1988
- Length
- 9.1 m (29.9 ft)
- Max Span
- 7.9 m
- Width
- 18.4 m (60.4 ft)
- Lanes
- 2
- Daily Traffic
- 19,487
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $272,000
- Total Project Cost
- $314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.