US302 NH 16 over ARTIST FALLS BROOK

6.2 MI FROM ALBANY TL · County 003, New Hampshire · Built 1900 · 2 Lanes · 13,702 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
005400790006300
Year Built
1900
Reconstructed
1964
Length
7.9 m (25.9 ft)
Max Span
7.9 m
Lanes
2
Daily Traffic
13,702
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.