RIVER ROAD over SACO RIVER OVERFLOW

2.0 MI FROM BARTLETT TL · County 003, New Hampshire · Built 1955 · 2 Lanes · 4,649 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
005400630004700
Year Built
1955
Reconstructed
2005
Length
37.6 m (123.4 ft)
Max Span
13.7 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
4,649
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.