W PAGODA CIR DR over RVR DES PERES LAGO
S 1201 T 45 N R 6 E · County 510, Missouri · Built 2000 · 2 Lanes · 9,000 vehicles/day
Overall
Culvert
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 8 | Very Good |
Location
38.641333, -90.282711
This bridge is in worse condition than 4.2% of bridges in County 510. The average bridge in Missouri is 0 years old; this one is 26 years old.
Nearby Bridges
GOVERNMENT DR over RVR DES PERES LAGO
Built 2017
MCKINLEY DR over RVR DES PERES LAGO
Built 1997
PAGODA CIRCLE DR over RVR DES PERES LAGO
Built 2000
THEATER DR over RVR DES PERES LAGO
Built 1922
LAGOON DR over RVR DES PERES LAGO
Built 1989
DE BALIVIERE BLVD over METROLINK
Built 1937
LINDELL-UNION over FOREST PARK PKWY
Built 1961
GRAND DR over RVR DES PERES LAGO
Built 1935
LINDELL-UNION over METROLINK
Built 1929
E GRAND DR over RVR DES PERES LAGO
Built 2002
Bridge Details
- Structure #
- 28409
- Year Built
- 2000
- Length
- 24.4 m (80.1 ft)
- Max Span
- 12.8 m
- Lanes
- 2
- Daily Traffic
- 9,000
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.