PAGODA CIRCLE DR over RVR DES PERES LAGO
S 1201 T 45 N R 6 E · County 510, Missouri · Built 2000 · 2 Lanes · 9,000 vehicles/day
Overall
Culvert
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 8 | Very Good |
Location
38.641972, -90.280197
This bridge is in worse condition than 4.2% of bridges in County 510. The average bridge in Missouri is 0 years old; this one is 26 years old.
Nearby Bridges
THEATER DR over RVR DES PERES LAGO
Built 1922
W PAGODA CIR DR over RVR DES PERES LAGO
Built 2000
MCKINLEY DR over RVR DES PERES LAGO
Built 1997
GOVERNMENT DR over RVR DES PERES LAGO
Built 2017
LINDELL-UNION over FOREST PARK PKWY
Built 1961
LINDELL-UNION over METROLINK
Built 1929
GRAND DR over RVR DES PERES LAGO
Built 1935
E GRAND DR over RVR DES PERES LAGO
Built 2002
LAGOON DR over RVR DES PERES LAGO
Built 1989
DE BALIVIERE BLVD over METROLINK
Built 1937
Bridge Details
- Structure #
- 28408
- Year Built
- 2000
- Length
- 22.9 m (75.1 ft)
- Max Span
- 11 m
- Width
- 17.3 m (56.8 ft)
- Lanes
- 2
- Daily Traffic
- 9,000
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.