LAGOON DR over RVR DES PERES LAGO
S 1201 T 45 N R 6 E · County 510, Missouri · Built 1989 · 2 Lanes · 1,600 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
38.642158, -90.288286
This bridge is in worse condition than 8.8% of bridges in County 510. The average bridge in Missouri is 0 years old; this one is 37 years old.
Nearby Bridges
GOVERNMENT DR over RVR DES PERES LAGO
Built 2017
W PAGODA CIR DR over RVR DES PERES LAGO
Built 2000
MCKINLEY DR over RVR DES PERES LAGO
Built 1997
DE BALIVIERE BLVD over METROLINK
Built 1937
PAGODA CIRCLE DR over RVR DES PERES LAGO
Built 2000
LAURAL & WATERMAN over METROLINK
Built 1936
THEATER DR over RVR DES PERES LAGO
Built 1922
CONCOURSE DR S over PEDESTRIAN TUNNEL
Built 2009
HAMILTON BLVD over ALLEY METROLINK
Built 2024
HAMILTON over METROLINK
Built 1936
Bridge Details
- Structure #
- 14195
- Year Built
- 1989
- Length
- 15.2 m (49.9 ft)
- Max Span
- 14.4 m
- Width
- 16.9 m (55.4 ft)
- Lanes
- 2
- Daily Traffic
- 1,600
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.