HAMILTON over METROLINK
S 1201 T 45 N R 6 E · County 510, Missouri · Built 1936 · 2 Lanes · 1,300 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
3
Serious
Superstructure
3
Serious
Substructure
3
Serious
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 3 | Serious |
| Superstructure | 3 | Serious |
| Substructure | 3 | Serious |
Location
38.652142, -90.292025
This bridge is in worse condition than 96.2% of bridges in County 510. The average bridge in Missouri is 0 years old; this one is 90 years old.
Nearby Bridges
HAMILTON BLVD over ALLEY METROLINK
Built 2024
LAURAL & WATERMAN over METROLINK
Built 1936
DELMAR BLVD over METROLINK
Built 2008
DE BALIVIERE BLVD over METROLINK
Built 1937
LAGOON DR over RVR DES PERES LAGO
Built 1989
W PAGODA CIR DR over RVR DES PERES LAGO
Built 2000
GOVERNMENT DR over RVR DES PERES LAGO
Built 2017
PAGODA CIRCLE DR over RVR DES PERES LAGO
Built 2000
ETZEL AVE over BR RVR DES PERES
Built 1987
MCKINLEY DR over RVR DES PERES LAGO
Built 1997
Bridge Details
- Structure #
- 12949
- Year Built
- 1936
- Length
- 27.4 m (89.9 ft)
- Max Span
- 10.4 m
- Width
- 17.7 m (58.1 ft)
- Lanes
- 2
- Daily Traffic
- 1,300
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $665,000
- Total Project Cost
- $998,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.