LINDELL-UNION over METROLINK

S 3125 T 45 N R 6 E · County 510, Missouri · Built 1929 · 4 Lanes · 30,000 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
12952
Year Built
1929
Length
19.2 m (63 ft)
Max Span
9.8 m
Width
61 m (200.1 ft)
Lanes
4
Daily Traffic
30,000
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$890,000
Total Project Cost
$1,335,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.