GRAND DR over RVR DES PERES LAGO
S 1201 T 45 N R 6 E · County 510, Missouri · Built 1935 · 2 Lanes · 5,000 vehicles/day
Overall
Deck
9
Excellent
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
38.645022, -90.274656
This bridge is in worse condition than 4.2% of bridges in County 510. The average bridge in Missouri is 0 years old; this one is 91 years old.
Nearby Bridges
LINDELL-UNION over METROLINK
Built 1929
LINDELL-UNION over FOREST PARK PKWY
Built 1961
E GRAND DR over RVR DES PERES LAGO
Built 2002
GRAND DR over FOREST PARK PKWY
Built 1961
GRAND DR over METROLINK
Built 1936
THEATER DR over RVR DES PERES LAGO
Built 1922
PAGODA CIRCLE DR over RVR DES PERES LAGO
Built 2000
W PAGODA CIR DR over RVR DES PERES LAGO
Built 2000
MCKINLEY DR over RVR DES PERES LAGO
Built 1997
FOREST PARK PKWY over METROLINK
Built 2017
Bridge Details
- Structure #
- 14193
- Year Built
- 1935
- Reconstructed
- 2024
- Length
- 23.1 m (75.8 ft)
- Max Span
- 21.9 m
- Width
- 12.3 m (40.4 ft)
- Lanes
- 2
- Daily Traffic
- 5,000
- Material
- Steel
- Design
- Arch - Deck
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.