CSAH 35 over TH 62
0.4 MI E OF E JCT TH 35W · County 053, Minnesota · Built 1963 · 4 Lanes · 14,324 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
44.890642, -93.267833
This bridge is in worse condition than 71.1% of bridges in County 053. The average bridge in Minnesota is 0 years old; this one is 63 years old.
Nearby Bridges
CON 6315 over I 35W MN 62 WB
Built 2008
MN 62 over I 35W; NICOLLET AVE S
Built 2008
I 35W over E 60 ST (MSAS 271)
Built 2008
CON 76 over E 60 ST (MSAS 271)
Built 2008
I 35W over NICOLLET AVE SO(CSAH 52)
Built 2008
CON 76 over NICOLLET AVE SO
Built 2008
I 35W over NICOLLET AVE SO(CSAH 52)
Built 2008
MN 62 over NICOLLET AVE SO
Built 2007
MN 62 over CP RAIL
Built 2007
I 35W over CP RAIL
Built 2007
Bridge Details
- Structure #
- 7269
- Year Built
- 1963
- Length
- 46.4 m (152.2 ft)
- Max Span
- 22.6 m
- Width
- 19.6 m (64.3 ft)
- Lanes
- 4
- Daily Traffic
- 14,324
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $972,000,000
- Total Project Cost
- $999,999,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.