CON 76 over E 60 ST (MSAS 271)
0.2 MI N OF E JCT 35W · County 053, Minnesota · Built 2008 · 3 Lanes · 52,828 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
44.894275, -93.275397
This bridge is in worse condition than 16.3% of bridges in County 053. The average bridge in Minnesota is 0 years old; this one is 18 years old.
Nearby Bridges
I 35W over E 60 ST (MSAS 271)
Built 2008
MN 62 over I 35W; NICOLLET AVE S
Built 2008
CON 6315 over I 35W MN 62 WB
Built 2008
CON 76 over NICOLLET AVE SO
Built 2008
I 35W over NICOLLET AVE SO(CSAH 52)
Built 2008
I 35W over NICOLLET AVE SO(CSAH 52)
Built 2008
MN 62 over NICOLLET AVE SO
Built 2007
CSAH 35 over TH 62
Built 1963
MN 62 over CP RAIL
Built 2007
I 35W over CP RAIL
Built 2007
Bridge Details
- Structure #
- 27V80
- Year Built
- 2008
- Length
- 29.1 m (95.5 ft)
- Max Span
- 26.3 m
- Width
- 18.1 m (59.4 ft)
- Lanes
- 3
- Daily Traffic
- 52,828
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $971,000,000
- Total Project Cost
- $1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.