MN 62 over I 35W; NICOLLET AVE S

AT THE E JCT MN 62; 35W · County 053, Minnesota · Built 2008 · 2 Lanes · 30,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
27V76
Year Built
2008
Length
247.3 m (811.4 ft)
Max Span
57.9 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
30,000
Material
Prestressed Concrete Continuous
Design
Segmental Box Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$999,999,000
Total Project Cost
$1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.