I 35W over NICOLLET AVE SO(CSAH 52)

0.1 MI W OF E JCT MN 62 · County 053, Minnesota · Built 2008 · 4 Lanes · 43,855 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
27V86
Year Built
2008
Length
27.9 m (91.5 ft)
Max Span
27 m
Width
27.5 m (90.2 ft)
Lanes
4
Daily Traffic
43,855
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$999,999,000
Total Project Cost
$1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.