CON 76 over NICOLLET AVE SO
RAMP OVER NICOLLET AVE · County 053, Minnesota · Built 2008 · 2 Lanes · 1 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
44.890781, -93.2781
This bridge is in worse condition than 16.3% of bridges in County 053. The average bridge in Minnesota is 0 years old; this one is 18 years old.
Nearby Bridges
I 35W over NICOLLET AVE SO(CSAH 52)
Built 2008
I 35W over NICOLLET AVE SO(CSAH 52)
Built 2008
MN 62 over NICOLLET AVE SO
Built 2007
MN 62 over I 35W; NICOLLET AVE S
Built 2008
CON 6315 over I 35W MN 62 WB
Built 2008
MN 62 over CP RAIL
Built 2007
I 35W over CP RAIL
Built 2007
MN 62 over CP RAIL
Built 2007
CON 76 over E 60 ST (MSAS 271)
Built 2008
I 35W over E 60 ST (MSAS 271)
Built 2008
Bridge Details
- Structure #
- 27V75
- Year Built
- 2008
- Length
- 322.3 m (1057.4 ft)
- Max Span
- 61 m
- Width
- 13.2 m (43.3 ft)
- Lanes
- 2
- Daily Traffic
- 1
- Material
- Prestressed Concrete Continuous
- Design
- Segmental Box Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $999,999,000
- Total Project Cost
- $1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.