HWY BLKSTN RVR R over WATER BLACKSTONE RIVER
500 FT W TOBIAS BOLND WAY · County 027, Massachusetts · Built 2001 · 2 Lanes · 4,270 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
42.227867, -71.7876
This bridge is in worse condition than 60.4% of bridges in County 027. The average bridge in Massachusetts is 0 years old; this one is 25 years old.
Nearby Bridges
HWY BLKSTN RV RD over ST146 /ST122A
Built 2001
ST146 /ST122A/SB over WATER BLACKSTONE RIVER
Built 1997
ST146 /ST122A/NB over WATER BLACKSTONE RIVER
Built 1997
HWY MCKEON RD over ST146 /ST122A & NB ON RP
Built 2005
HWY MCKEON RD over COMB BLKSTNE RIV / BKWY
Built 2005
HWY PAUL CLANCY over WATER MIDDLE RIVER
Built 2006
ST146 NB over WATER BLACKSTONE RIVER
Built 1997
ST146 SB over WATER BLACKSTONE RIVER
Built 1997
US 20 WB over COMB ST146&PWRR&BLKSTN
Built 2005
US 20 EB over COMB ST146&PWRR&BLKSTN
Built 2005
Bridge Details
- Structure #
- W44156ANPDOTNBI
- Year Built
- 2001
- Length
- 76.2 m (250 ft)
- Max Span
- 36.8 m
- Width
- 15.2 m (49.9 ft)
- Lanes
- 2
- Daily Traffic
- 4,270
- Material
- Steel Continuous
- Design
- Box Beam or Girders - Single or Spread
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $7,518,000
- Total Project Cost
- $11,278,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.