HWY BLKSTN RVR R over WATER BLACKSTONE RIVER

500 FT W TOBIAS BOLND WAY · County 027, Massachusetts · Built 2001 · 2 Lanes · 4,270 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
W44156ANPDOTNBI
Year Built
2001
Length
76.2 m (250 ft)
Max Span
36.8 m
Width
15.2 m (49.9 ft)
Lanes
2
Daily Traffic
4,270
Material
Steel Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$7,518,000
Total Project Cost
$11,278,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.