HWY PAUL CLANCY over WATER MIDDLE RIVER

JUST SW OF PED OVER 146 · County 027, Massachusetts · Built 2006 · 2 Lanes · 300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
W44153AKWMUNNBI
Year Built
2006
Length
32.4 m (106.3 ft)
Max Span
31 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
300
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$617,000
Total Project Cost
$926,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.