I 290 EB over OTHER 146 RAMP & PWRR

.1 MI. W. OF CAMBRIDGE ST · County 027, Massachusetts · Built 1966 · 3 Lanes · 42,189 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
W441091T0DOTNBI
Year Built
1966
Reconstructed
2007
Length
106.6 m (349.7 ft)
Max Span
29.8 m
Width
16.9 m (55.4 ft)
Lanes
3
Daily Traffic
42,189
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,335,000
Total Project Cost
$6,503,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.