HWY MCKEON RD over ST146 /ST122A & NB ON RP
@MM19.9 / EXIT 20 · County 027, Massachusetts · Built 2005 · 5 Lanes · 16,902 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
42.236292, -71.793453
This bridge is in worse condition than 11.5% of bridges in County 027. The average bridge in Massachusetts is 0 years old; this one is 21 years old.
Nearby Bridges
HWY MCKEON RD over COMB BLKSTNE RIV / BKWY
Built 2005
HWY PAUL CLANCY over WATER MIDDLE RIVER
Built 2006
HWY BLKSTN RVR R over WATER BLACKSTONE RIVER
Built 2001
HWY BLKSTN RV RD over ST146 /ST122A
Built 2001
I 290 EB over OTHER 146 RAMP & PWRR
Built 1966
I 290 WB over OTHER 146 RAMP & PWRR
Built 1966
I 290 over ST146 MILLBURY ST
Built 2007
ST146 NB OFF RAMP over OTHER BIKEWAY
Built 2006
ST146 SB ON RAMP over ST146
Built 2005
I 290 EB over HWY ASHMONT AVE
Built 1959
Bridge Details
- Structure #
- W44161ATHDOTNBI
- Year Built
- 2005
- Length
- 44.8 m (147 ft)
- Max Span
- 24.4 m
- Width
- 27.9 m (91.5 ft)
- Lanes
- 5
- Daily Traffic
- 16,902
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,823,000
- Total Project Cost
- $2,735,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.