ST146 /ST122A/SB over WATER BLACKSTONE RIVER

MM 18.7 · County 027, Massachusetts · Built 1997 · 2 Lanes · 28,704 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
W4414683JDOTNBI
Year Built
1997
Length
72.4 m (237.5 ft)
Max Span
35 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
28,704
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$683,000
Total Project Cost
$1,025,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.