I 190 NB over HWY W BOYLSTON DR

1000 FT W. OF NEPONSET ST · County 027, Massachusetts · Built 1977 · 3 Lanes · 22,366 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
W441321XNDOTNBI
Year Built
1977
Length
41.5 m (136.2 ft)
Max Span
39.6 m
Width
17.4 m (57.1 ft)
Lanes
3
Daily Traffic
22,366
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,440,000
Total Project Cost
$2,161,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.