ST 12 SB/W BYLSTN over RR PWRR/BMRR
.2 MI.E. OF I-190 · County 027, Massachusetts · Built 1936 · 1 Lanes · 6,014 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
42.3002, -71.800939
This bridge is in worse condition than 60.4% of bridges in County 027. The average bridge in Massachusetts is 0 years old; this one is 90 years old.
Nearby Bridges
ST 12 NB/W BYLSTN over RR PWRR/BMRR
Built 1936
ST 12 SB over HWY NEPONSET ST
Built 1977
ST 12 NB over HWY NEPONSET ST
Built 1977
HWY STORES ST NB over ST 12 SB & W BOYLSTON DR
Built 1977
I 190 NB ON RAMP D over ST 12 SB & W BOYLSTON DR
Built 1977
I 190 NB over ST 12 SB
Built 1977
I 190 NB over HWY W BOYLSTON DR
Built 1977
I 190 SB over HWY W BOYLSTON DR
Built 1977
I 190 SB over ST 12 SB
Built 1977
I 190 SB RAMP C over HWY W BOYLSTON DR
Built 1977
Bridge Details
- Structure #
- W44065238DOT634
- Year Built
- 1936
- Reconstructed
- 1978
- Length
- 39.6 m (129.9 ft)
- Max Span
- 35.1 m
- Width
- 11.6 m (38.1 ft)
- Lanes
- 1
- Daily Traffic
- 6,014
- Material
- Steel
- Design
- Girder and Floorbeam System
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,013,000
- Total Project Cost
- $4,520,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.