I 190 SB RAMP C over HWY W BOYLSTON DR

AT MATTSON AVE · County 027, Massachusetts · Built 1977 · 1 Lanes · 7,640 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
W441311XMDOTNBI
Year Built
1977
Length
41.5 m (136.2 ft)
Max Span
39.6 m
Width
8.2 m (26.9 ft)
Lanes
1
Daily Traffic
7,640
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$786,000
Total Project Cost
$1,180,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.