I 190 NB ON RAMP D over ST 12 SB & W BOYLSTON DR

.5 MI S OF ARARAT ST · County 027, Massachusetts · Built 1977 · 1 Lanes · 6,183 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
W441271XLDOTNBI
Year Built
1977
Length
101.5 m (333 ft)
Max Span
39 m
Width
8.1 m (26.6 ft)
Lanes
1
Daily Traffic
6,183
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,908,000
Total Project Cost
$2,863,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.