ST 12 NB/W BYLSTN over RR PWRR/BMRR
.2 MI E OF I-190 · County 027, Massachusetts · Built 1936 · 2 Lanes · 7,028 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
4
Poor
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 4 | Poor |
| Substructure | 6 | Satisfactory |
Location
42.3, -71.800931
This bridge is in worse condition than 92.7% of bridges in County 027. The average bridge in Massachusetts is 0 years old; this one is 90 years old.
Nearby Bridges
ST 12 SB/W BYLSTN over RR PWRR/BMRR
Built 1936
ST 12 SB over HWY NEPONSET ST
Built 1977
ST 12 NB over HWY NEPONSET ST
Built 1977
HWY STORES ST NB over ST 12 SB & W BOYLSTON DR
Built 1977
I 190 NB ON RAMP D over ST 12 SB & W BOYLSTON DR
Built 1977
I 190 NB over ST 12 SB
Built 1977
I 190 NB over HWY W BOYLSTON DR
Built 1977
I 190 SB over HWY W BOYLSTON DR
Built 1977
I 190 SB over ST 12 SB
Built 1977
I 190 SB RAMP C over HWY W BOYLSTON DR
Built 1977
Bridge Details
- Structure #
- W44065237DOT634
- Year Built
- 1936
- Reconstructed
- 1978
- Length
- 39.6 m (129.9 ft)
- Max Span
- 35.1 m
- Width
- 11.4 m (37.4 ft)
- Lanes
- 2
- Daily Traffic
- 7,028
- Material
- Steel
- Design
- Girder and Floorbeam System
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,961,000
- Total Project Cost
- $4,442,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.