I 290 WB over ST 70 LNCLN ST & ON RAMP
.25 MILES N. OF ST-9 · County 027, Massachusetts · Built 1961 · 4 Lanes · 71,116 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
42.274856, -71.796419
This bridge is in worse condition than 60.4% of bridges in County 027. The average bridge in Massachusetts is 0 years old; this one is 65 years old.
Nearby Bridges
I 290 EB over ST 70 LNCLN ST & ON RAMP
Built 1961
HWY LINCOLN ST over RR PWRR/BMRR
Built 1953
ST 9 BELMONT ST over HWY GOLDSBERRY ST
Built 1953
ST 9 BELMONT ST over I 290
Built 1958
HWY CITY TUNNEL over HWY HIGHLAND ST
Built 1954
HWY GROVE ST over WATER SALISBURY PND OTLT
Built 1953
HWY GOLDSBRY ST over RR P&W/B&M/TNL
Built 1953
HWY LANCASTER ST over WATER SALISBURY PD OTLT
Built 1953
HWY LAUREL ST over I 290
Built 1958
I 290 & RAMPS over HWY PROSPECT ST
Built 1958
Bridge Details
- Structure #
- W440951TDDOTNBI
- Year Built
- 1961
- Reconstructed
- 1982
- Length
- 42 m (137.8 ft)
- Max Span
- 25.3 m
- Width
- 17.8 m (58.4 ft)
- Lanes
- 4
- Daily Traffic
- 71,116
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $4,969,000
- Total Project Cost
- $7,454,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.