HWY GOLDSBRY ST over RR P&W/B&M/TNL

FROM SCHOOL STREET NORTH · County 027, Massachusetts · Built 1953 · 2 Lanes · 9,619 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
W44078239DOT634
Year Built
1953
Length
12.8 m (42 ft)
Max Span
6.1 m
Width
30.4 m (99.7 ft)
Lanes
2
Daily Traffic
9,619
Material
Steel
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,577,000
Total Project Cost
$3,866,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.