HWY CITY TUNNEL over HWY HIGHLAND ST

.2 MI. W. OF I-290 · County 027, Massachusetts · Built 1954 · 2 Lanes · 1,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
W44074B99MUNNBI
Year Built
1954
Length
11.2 m (36.7 ft)
Max Span
11.2 m
Width
140 m (459.3 ft)
Lanes
2
Daily Traffic
1,000
Material
Steel
Design
Frame (except frame culverts)
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$10,907,000
Total Project Cost
$16,361,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.