I 290 & RAMPS over HWY PROSPECT ST
.1 MI E OF SUMMER ST · County 027, Massachusetts · Built 1958 · 8 Lanes · 114,878 vehicles/day
Overall
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
42.267344, -71.793242
This bridge is in worse condition than 60.4% of bridges in County 027. The average bridge in Massachusetts is 0 years old; this one is 68 years old.
Nearby Bridges
HWY LAUREL ST over I 290
Built 1958
I 290 WB over HWY E CENTRAL ST
Built 1958
I 290 EB over HWY E CENTRAL ST
Built 1958
HWY GOLDSBRY ST over RR P&W/B&M/TNL
Built 1953
ST 9 BELMONT ST over I 290
Built 1958
ST 9 BELMONT ST over HWY GOLDSBERRY ST
Built 1953
I 290 SHWBY ST OFR over HWY MBTA PKNG ACCSS
Built 1960
HWY CITY TUNNEL over HWY HIGHLAND ST
Built 1954
I 290 EB over COMB 4 CITY STS & CSX
Built 1958
HWY LINCOLN ST over RR PWRR/BMRR
Built 1953
Bridge Details
- Structure #
- W440921TBDOTNBI
- Year Built
- 1958
- Length
- 13.4 m (44 ft)
- Max Span
- 11.3 m
- Width
- 53.1 m (174.2 ft)
- Lanes
- 8
- Daily Traffic
- 114,878
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $4,827,000
- Total Project Cost
- $7,241,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.