I 290 SHWBY ST OFR over HWY MBTA PKNG ACCSS

.1 MI.E.OF WASHINGTON SQ. · County 027, Massachusetts · Built 1960 · 1 Lanes · 9,146 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
W440821TTDOTNBI
Year Built
1960
Reconstructed
1985
Length
116.4 m (381.9 ft)
Max Span
21.9 m
Width
9.5 m (31.2 ft)
Lanes
1
Daily Traffic
9,146
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,444,000
Total Project Cost
$2,167,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.