I 290 WB over COMB 4 CITY STS & CSX

I 290/RR & 4 CITY STS · County 027, Massachusetts · Built 1958 · 4 Lanes · 76,700 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
W440821T8DOTNBI
Year Built
1958
Reconstructed
2007
Length
474 m (1555.1 ft)
Max Span
48.8 m
Width
17.3 m (56.8 ft)
Lanes
4
Daily Traffic
76,700
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$53,349,000
Total Project Cost
$80,024,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.