HWY LAUREL ST over I 290

.2 MI E OF SUMMER ST · County 027, Massachusetts · Built 1958 · 2 Lanes · 500 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
W44093213DOTNBI
Year Built
1958
Length
42.1 m (138.1 ft)
Max Span
21.3 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
500
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$7,877,000
Total Project Cost
$11,816,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.