HWY HAMILTON ST over RR MBTA/CSX

0.3 MI WEST OF LAKE AVE · County 027, Massachusetts · Built 1931 · 2 Lanes · 7,497 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
W4403123CDOT634
Year Built
1931
Reconstructed
1995
Length
18 m (59.1 ft)
Max Span
16.2 m
Width
16.2 m (53.1 ft)
Lanes
2
Daily Traffic
7,497
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$356,000
Total Project Cost
$535,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.