ST 9 BELMONT ST W over WATER LAKE QUINSIGAMOND

100 F.T. E. OF LAKE AVE. · County 027, Massachusetts · Built 2015 · 4 Lanes · 27,700 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
S14001BL6DOTNBI
Year Built
2015
Length
265.1 m (869.8 ft)
Max Span
73.2 m
Width
19.2 m (63 ft)
Lanes
4
Daily Traffic
27,700
Material
Steel Continuous
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$31,084,000
Total Project Cost
$46,627,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.