I 290 EB over COMB LK QUINSIG&LK AV N

I-290 MM 10 · County 027, Massachusetts · Built 1968 · 3 Lanes · 39,309 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
S140211RADOTNBI
Year Built
1968
Length
257.6 m (845.1 ft)
Max Span
104.2 m
Width
17.1 m (56.1 ft)
Lanes
3
Daily Traffic
39,309
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$11,658,000
Total Project Cost
$17,488,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.