I 290 WB over HWY W MAIN ST

.4 MI. EAST OF WORC T.L. · County 027, Massachusetts · Built 1968 · 4 Lanes · 43,007 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
S140231RFDOTNBI
Year Built
1968
Length
45.3 m (148.6 ft)
Max Span
22.7 m
Width
17.7 m (58.1 ft)
Lanes
4
Daily Traffic
43,007
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,150,000
Total Project Cost
$6,226,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.