HWY POTATO HL RD over WATER PHILLIPS BROOK

0.1MI W OF ST-12 · County 027, Massachusetts · Built 1993 · 2 Lanes · 200 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
W280091J9MUNNBI
Year Built
1993
Length
9.8 m (32.2 ft)
Max Span
9.1 m
Width
11.1 m (36.4 ft)
Lanes
2
Daily Traffic
200
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$721,000
Total Project Cost
$1,082,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.