HWY FRED SMTH RD over WATER PHILLIPS BROOK

.1 MI. NE. OF RT. 12 · County 027, Massachusetts · Built 1988 · 2 Lanes · 300 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
W280041JCMUNNBI
Year Built
1988
Length
12.8 m (42 ft)
Max Span
3.7 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
300
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$748,000
Total Project Cost
$1,123,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.